Solicitation 130992 Coleman Bridge HPU Integration
Virginia Department of Transportation
Quick triage
What you can decide before opening a single document.
- Can you bid yet? Open for bids
A solicitation: responses are being accepted.
- Who can bid? No set-aside stated
eVA (Virginia) publishes set-asides, and none is stated on this notice.
- Your kind of work, at your size? Non-professional Services - Non-Technology
The board's own category, not a code in any taxonomy.
- Where is the work? Coleman Bridge, Virginia
eVA (Virginia) lists only Virginia work.
- Is there time? Closes Tue, Nov 24, 2026, 12:00 PM EST
- Is the package here? Attachments aren't in this feed
eVA (Virginia) doesn't publish documents through its feed. The package is on the official notice.
Checked against eVA (Virginia) on Nov 17, 2026. The official notice is authoritative.
- Closes
- November 24, 2026
- Published
- November 9, 2026
- Place of performance
- Coleman Bridge, Virginia
- Notice type
- Open for bids
- Solicitation no.
- 130992
What changed since it was posted
- Spotted Nov 10, 2026 Closing date extended
Nov 10, 2026, 12:00 AM UTC → Nov 24, 2026, 5:00 PM UTC
Dates are when Offra's regular check of the source saw the change, which can trail the buyer by up to a day. The official notice is authoritative.
Scope
To modify the existing far side movable grating HPU starter box, install a new PLC control cabinet on Pier 1N and control cabinet on thefar side span lock platform, remove all of the existing fully seated movable grating limit switches, install new movable gratingfully seated limit switches at, install new fully raised movable grating limit switches and rotary cam limit switch at the far sidespan
This is an extract. Read the complete notice, documents and any amendments on the issuing authority's site before bidding.
Should you bid on this? See the answer — free
A free account opens this notice's bid report for your firm and watches the notice for changes. No credit card.
- Go or no-go on this notice for your firm, with your chance of winning and the evidence behind it
- Who has been winning this buyer’s work, where the award records show it
Your first 14 days include the go/no-go on every notice. The account stays free after that, and nothing is ever charged without you choosing a plan. When a notice is worth answering, buy that one bid, with no subscription, and Offra reads the package and checks your bid before it goes out.
Sourced from the issuing authority's public feed. Offra republishes an extract for discovery; the authority's posting is authoritative.