6 days left Colorado No Set aside used
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.418TH CSB.W6QM MICC-FT CARSON
The Government is conducting market research to identify responsible sources capable of providing commercial vehicle aftermarket equipment and professional mechanical and electrical installation services for three (3) 2024 Ram 2500 pickup trucks supporting the U.S. Army Garrison Fort Carson Directorate of Emergency Services (DES). The anticipated requirement is a Firm-Fixed-Price contract with an
6 days left Colorado No Set aside used
AGRICULTURE, DEPARTMENT OF.FOREST SERVICE.USDA-FS, CSA INTERMOUNTAIN 4
1. Purpose The Government is conducting market research to identify qualified small business concerns capable of providing comprehensive janitorial services in Eagle, Colorado. The information collected will be used to determine the availability and capability of small businesses and specific socioeconomic categories for a potential set-aside acquisition. This RFI is issued solely for planning and
22 days left Colorado
City of Pueblo
The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrical for the units and thermostats, and install new 1-ton rooftop air-conditioning units at each building (Daft and Secondary Buildings) using the existing roof openings where applicable. Contractor shall complete all
22 days left Colorado
City of Pueblo
The City of Pueblo is seeking qualified construction management firms to provide on-call services for City construction, maintenance, and repair projects. Services may include project planning, cost estimating, contractor selection, construction oversight, schedule and budget management, inspections, change-order administration, and project closeout. The City may award contracts to more than one f
22 days left Colorado
City of Pueblo
The City of Pueblo is seeking a qualified Contractor to provide materials and labor for the Oxic Reactor Basin, we are seeking better air flow control then the current Butterfly valve can attain. We want to use Iris valves for better combination pressure reducing and pressure sustaining control for the Water Treatment Plant. The work includes, but is not limited to, the removal of an existing 8 in
22 days left Colorado
City of Pueblo
In general, this project will consist of Brief Description. Work includes: Installing a wall between the two truck bays and another wall behind the parking area in the longer bay Removing and salvaging the existing large overhead door for the City Infill of the exterior wall with matching brick and installation of a smaller overhead door Finishing the miscellaneous use room with gypsum board walls