Solicitation 26/27-17 FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Town of Manchester
Quick triage
What you can decide before opening a single document.
- Can you bid yet? Open for bids
A solicitation: responses are being accepted.
- Who can bid? Not in this feed
OpenGov (multi-state) publishes no set-aside field. State and city programs (HUB, M/WBE, DBE, SWaM) are named on the official notice, if at all.
- Your kind of work, at your size? NIGP 91359— Construction and Upgrades, Wastewater Treatment Plant; Maintenance and Repair, Wastewater Treatment Plant
This board classifies with NIGP, not NAICS, so no SBA size standard applies to the code itself.
- Where is the work? Manchester, Connecticut
A local buyer, buying for its own jurisdiction.
- Is there time? Closes Mon, Nov 30, 2026, 4:00 PM UTC
- Is the package here? 22 attachments posted
They open on the official notice, or named and linked inside Offra with a free account.
Amended— last on Nov 16, 2026. Re-read the package before you write against it.
Checked against OpenGov (multi-state) on Nov 18, 2026. The official notice is authoritative.
- Closes
- November 30, 2026
- Published
- October 20, 2026
- Place of performance
- Manchester, Connecticut 06040
- Notice type
- Open for bids
- Category
- Construction and Upgrades, Wastewater Treatment Plant; Maintenance and Repair, Wastewater Treatment Plant
- Method
- Request For Proposal
- Solicitation no.
- 26/27-17
What changed since it was posted
- Spotted Nov 17, 2026 Closing date extended
Nov 17, 2026, 4:00 PM UTC → Nov 30, 2026, 4:00 PM UTC
Dates are when Offra's regular check of the source saw the change, which can trail the buyer by up to a day. The official notice is authoritative.
Before you bid
- Questions due
- November 10, 2026 Last day to ask the buyer anything.
- Pre-bid meeting
- November 3, 2026
Scope
The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to replace Siphon No. 1 and Siphon No. 3 at the Globe Hollow Water Treatment Plant, and to repair the associated discharge valves in the trough. Finished work shall match the repairs already completed on Siphon Nos. 2 and 4. Sequence may change due to operational needs. Both sedimentation basins that hou
This is an extract. Read the complete notice, documents and any amendments on the issuing authority's site before bidding.
Should you bid on this? See the answer — free
A free account opens this notice's bid report for your firm and watches the notice for changes. No credit card.
- Go or no-go on this notice for your firm, with your chance of winning and the evidence behind it
- Who has been winning this buyer’s work, where the award records show it
Your first 14 days include the go/no-go on every notice. The account stays free after that, and nothing is ever charged without you choosing a plan. When a notice is worth answering, buy that one bid, with no subscription, and Offra reads the package and checks your bid before it goes out.
Sourced from the issuing authority's public feed. Offra republishes an extract for discovery; the authority's posting is authoritative.