Solicitation W911RQ-27-S-C002 U.S. Army Contracting Command – Detroit Arsenal (ACC-DTA) Army Manufacturing Rodeo: sUAS Manufacturing Rodeo
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC RRAD
Quick triage
What you can decide before opening a single document.
- Can you bid yet? An announcement, not an invitation
A special notice — often an intent to award without competition, or an industry day. Read it before assuming you can compete.
- Who can bid? Open to all
The notice states that no set-aside is used.
- Your kind of work, at your size? No code published on this notice
PSC 1550 — Drones
- Where is the work? Texarkana, Texas
Place of performance, as published on the notice.
- Is there time? Closes Wed, Nov 18, 2026, 7:00 PM UTC
- Is the package here? 3 attachments posted
They open on the official notice, or named and linked inside Offra with a free account.
Checked against SAM.gov on Nov 17, 2026. The official notice is authoritative.
- Closes
- November 18, 2026
- Published
- November 16, 2026
- Place of performance
- Texarkana, Texas 75507
- Notice type
- Announcement Started as Special Notice
- Agency
- DEPT OF DEFENSEDEPT OF THE ARMYW6QK ACC RRAD
- Set-aside
- No Set aside used
- PSC
- 1550 — Drones
- Solicitation no.
- W911RQ-27-S-C002
Before you bid
- Notice archived
- December 3, 2026 After this the authority stops publishing it.
Scope
Background for Army Manufacturing Rodeo: Contemporary peer and near-peer conflicts have fundamentally reshaped modern multi-dominant warfare. Small Uncrewed Aircraft Systems (sUAS), autonomous systems, and loitering strike munitions are being consumed at consumption rates and volume comparable to conventional tube artillery. Prevailing operational environments necessitate deep operational magazine
This is an extract. Read the complete notice, documents and any amendments on the issuing authority's site before bidding.
Should you bid on this? See the answer — free
A free account opens this notice's bid report for your firm and watches the notice for changes. No credit card.
- Go or no-go on this notice for your firm, with your chance of winning and the evidence behind it
- How many firms bid on past awards like this one, from the award records
- Who has been winning this buyer’s work, where the award records show it
Your first 14 days include the go/no-go on every notice. The account stays free after that, and nothing is ever charged without you choosing a plan. When a notice is worth answering, buy that one bid, with no subscription, and Offra reads the package and checks your bid before it goes out.
Sourced from the issuing authority's public feed. Offra republishes an extract for discovery; the authority's posting is authoritative.