Erickson Ave Waterline Replacement (2nd St to 5th St)
City of Beaverton
The Erickson Avenue Waterline Replacement (2nd Street to 5th Street) will replace an existing 1940s-era 8-inch cast iron water main with approximately 1,060 linear feet of new ductile iron water main, consisting of 1,020 feet of 12-inch pipe and 40 feet of 8-inch pipe. The work includes two connections to the existing system (one each at the north and south project limits), one fire hydrant assemb
- Closes
- October 21, 2026
- Added
- October 1, 2026