38 days left Florida
City of Clearwater
The project Work includes repairs and restoration of an existing boat ramp which has experienced varying levels of degradation as typical of boat ramps since original construction. The existing structure includes concrete of various strengths, thickness, reinforcement, and underlayment support. Subsurface conditions include a mixture of consolidated and unconsolidated soils and voids beneath the e
24 days left Florida Changed 10d ago
City of Clearwater
Project consist of stormwater improvements to provide flood reduction with the replacement of bridges on Springtime Avenue and Overbrook Avenue and a double concrete box culvert on Douglas Avenue. The Contractor shall provide copies of a Current License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide fixed project signs a
17 days left Florida
City of Clearwater
Work under this Contract shall be performed only when authorized by the City through individual Work Orders and may include one or more of the following Groups of Work: Group A – Sanitary Sewer Trenchless Reconstruction Group B – Sewer Cleaning and Televising Inspection Group C – Wastewater Point Repair Group D – Sanitary Cleanouts and Laterals Group E – Manhole Surfacing - Polyurethane Group F –
10 days left Florida
City of Clearwater
The City of Clearwater is seeking responses from qualified design-build teams with expertise in the selection, purchase, and installation of a compressed natural gas (CNG)-powered standby emergency generator.
18 days left Florida Changed 9d ago
City of Clearwater
Rehabilitate twelve (12) existing sand filters, associated equipment, remove and replace seven (7) Kinetrol pneumatic actuator yokes on 20-inch Butterfly Valves (Filter Cells 1, 2, 7, 8, 11, and 12), flange bolts on 20-inch Backwash Inlet Butterfly Valve (Filter Cell 7, will only be necessary if Contractor confirms the valve is not functioning), two (2) 18-inch backwash pump discharge Check Valves