ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION
City of Hampton
The work under this Project generally consists of installing pedestrian facilities on both sides of Little Back River Road: an asphalt Shared-Use Path on the West side between Lamington Road and Oakville Road and a concrete sidewalk on the East side between Riverchase Drive and the existing sidewalk between Rosewood Drive and Westphal Drive.
- Closes
- November 3, 2026
- Added
- October 1, 2026