10 days left Colorado
City of Pueblo
The City of Pueblo, Colorado (the "City") is requesting proposals from qualified firms (each a "Proposer") to furnish temporary laborers and crew supervisors to supplement City staff during the "Clean and Connected Pueblo" cleanup campaign. The selected firm (the "Contractor") will provide all labor, supervision, personal protective equipment (PPE), and worker transportation needed to staff commun
19 days left Colorado
City of Pueblo
In general, this project will consist of Brief Description.
7 days left Colorado
City of Pueblo
In general, the successful bidder will furnish, deliver, place, remove, transport, and properly dispose of collected material from 30-yard and 40-yard roll-off waste containers for City special cleanup projects conducted within the City of Pueblo city limits. Submitted prices are to include all charges for labor, administration, materials, supplies, shipping/handling, unloading, loading, delivery,
19 days left Colorado
City of Pueblo
In general, this project will consist of Brief Description.
12 days left Colorado Changed today
City of Pueblo
In general, this project will consist of the rehabilitation of 23 existing bus stops on the west side of Pueblo, including new concrete pads, curb and gutter, sidewalks, upgraded curb ramps, replacement of existing benches at select locations, installation of new benches where none currently exist, designated alighting areas, and illuminated bus stop signs as detailed in the plans and specificatio
12 days left Colorado
City of Pueblo
The Sun Mountain Boulevard project involves constructing a new 0.75-mile, two-lane roadway connecting 31st Street to the north and 24th Street to the south. This new roadway will feature stop-controlled intersections at 31st Street and the future 27th Street, crossing Wildhorse Creek Drainageway. Additional improvements include Americans with Disabilities Act (ADA) compliant curb ramps, curb and g
5 days left Colorado Changed 6d ago
City of Pueblo
In general, this project will consist of Brief Description, as detailed in the plans and specifications. This project also includes the installation of raised medians on Pueblo Boulevard approximately 1200 feet to the east and 2000 feet to the west of Mirror Avenue. The raised medians will include a 6-inch over-excavation of native fill below existing asphalt and replacement with Class 6 ABC. The