34 days left Texas
TxDOT - Bryan District
FULL - WIDTH MOWING; LITTER REMOVAL - TRACT (1); LITTER REMOVAL - TRACT (2); LITTER REMOVAL - TRACT (3); MOBILIZATION (CALLOUT); TMA (MOBILE OPERATION)
34 days left Texas
TxDOT - Bryan District
TMA (MOBILE OPERATION); MOBILIZATION (CALLOUT); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R
34 days left Texas
TxDOT - Bryan District
D-GR HMA TY D PG 64-22 (PICKUP); D-GR HMA TY D PG 64-22 (DEL) SITE 1; D-GR HMA TY F PG 64-22 (PICKUP); D-GR HMA TY F PG 64-22 (DEL) SITE 1
34 days left Texas
TxDOT - Bryan District
D-GR HMA TY F PG 64-22 (PICKUP); D-GR HMA TY F PG 64-22 (DEL) SITE 1
34 days left Texas
TxDOT - Bryan District
LRA (TY II GR DS) (DEL) (ST1); LRA (TY II GR DS) (DEL) (ST2); LRA (TY II GR DS) (DEL) (ST3)
33 days left Texas
TxDOT - Bryan District
FULL - WIDTH MOWING; LITTER REMOVAL - TRACT (1); LITTER REMOVAL - TRACT (2); LITTER REMOVAL - TRACT (3); LITTER REMOVAL - TRACT (4); LITTER REMOVAL - TRACT (6); LITTER REMOVAL - TRACT (7); LITTER REMOVAL - TRACT (8); LITTER REMOVAL - TRACT (9); LITTER REMOVAL - TRACT (10); LITTER REMOVAL - TRACT (11); MOBILIZATION (CALLOUT); TMA (MOBILE OPERATION)
33 days left Texas
TxDOT - Bryan District
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6); DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7); TMA (MOBILE OPERATION)
33 days left Texas
TxDOT - Bryan District
D-GR HMA TY D PG 64-22 (PICKUP); D-GR HMA TY D PG 64-22 (DEL) SITE 1
33 days left Texas
TxDOT - Bryan District
D-GR HMA TY D PG 64-22 (PICKUP); D-GR HMA TY D PG 64-22 (DEL) SITE 1
33 days left Texas
TxDOT - Bryan District
AGGR (TY B GR 5) (DEL) (ST1); AGGR (TY B GR 5) (DEL) (ST2); AGGR (TY B GR 5) (DEL) (ST3)
33 days left Texas
TxDOT - Bryan District
LRA (TY II GR DS) (DEL) (ST1); LRA (TY II GR DS) (DEL) (ST2)
20 days left Texas
TxDOT - Bryan District
REMOV CONC (PAV); REMOV CONC (RIPRAP); EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); AGGR (TY-PB, GR-3)(SAC-A); CEM STABIL BKFL; FLOWABLE BACKFILL; CL C CONC (ABUT); CL C CONC (CAP); CL C CONC (COLUMN); APPROACH SLAB; RIPRAP (CONC)(4 IN); RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE PROTECTION)(18 IN); FOUNDATON LOADTEST(D4945)(DRILLD SHAFT); SET (TY I) (36 IN) (3: 1) (C); SET (TY I) (36 IN) (4: 1) (C); SET
20 days left Texas
TxDOT - Bryan District
REMOV CONC (RIPRAP); EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); AGGR (TY-PB, GR-3)(SAC-A); CEM STABIL BKFL; FLOWABLE BACKFILL; CL C CONC (ABUT); CL C CONC (CAP); CL C CONC (COLUMN); APPROACH SLAB; RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE PROTECTION)(18 IN); TMA (STATIONARY); TMA (MOBILE OPERATION); FOUNDATON LOADTEST(D4945)(DRILLD SHAFT); SET (TY II) (18 IN) (RCP) (6: 1) (P); SET (TY II) (24 IN) (RCP
20 days left Texas
TxDOT - Bryan District
REMOV CONC (RIPRAP); EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); CEM STABIL BKFL; CL C CONC (ABUT); CL C CONC (CAP); CL C CONC (COLUMN); APPROACH SLAB; RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE PROTECTION)(18 IN); HEADWALL (CH - FW - 0) (DIA= 36 IN); SET (TY I) (36 IN) (4: 1) (C); REMOV STR (SET); REMOV STR (HEADWALL); REMOV STR (BRIDGE 500 - 999 FT LENGTH); REMOVE STR (DRAINAGE FLUME); MTL BEAM GD FEN
20 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); RMV (10"-14") TRT/UNTRT BASE & ASPH PAV; RMV (12") TRT/UNTRT BASE & ASPH PAV; RMV (2"-8") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); HYDRO MULCH SEED (PERM_RURAL_SANDY); HYDRO MULCH SEED (TEMP_WARM); HYDRO MULCH SEED (TEMP_COOL); VEGETATIVE WATERING; SOIL RET BLKT(CHAN_PERM_2 PSF); SOIL RET BLKT(CHAN_PERM_4 PSF
20 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); RMV (10"-14") TRT/UNTRT BASE & ASPH PAV; RMV (12") TRT/UNTRT BASE & ASPH PAV; RMV (2"-8") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); HYDRO MULCH SEED (PERM_RURAL_SANDY); HYDRO MULCH SEED (TEMP_WARM); HYDRO MULCH SEED (TEMP_COOL); VEGETATIVE WATERING; SOIL RET BLKT(CHAN_PERM_2 PSF); SOIL RET BLKT(CHAN_PERM_4 PSF
19 days left Texas
TxDOT - Bryan District
EXCAV (ROADWAY); EXCAV (CHANNEL); EMBANK (FNL)(DC)(TY C); AGGR (TY-B OR L, GR-5); CEM STABIL BKFL; CL C CONC (ABUT); RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE PROTECTION)(18 IN); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); REMOV STR (BRIDGE 0 - 99 FT LENGTH); MTL BEAM GD FEN TRANS (TL2); GUARDRAIL END TREATMENT (INSTALL); REMOVE SM RD SN SUP&AM; INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI); INSTL