22 days left Texas Changed 5d ago
TxDOT - Dallas District
TMA (STATIONARY); WK ZN PAV MRK SHT TERM (TAB)TY Y-2; TACK COAT; MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; FLEXIBLE PAV STR REPAIR 12" -TYPICAL A; PLANE & TEXT ASPH CONC PAV(0" TO 4"); SP MIXES SP-C SAC-B PG70-22
22 days left Texas
TxDOT - Dallas District
PREPARING ROW; REMOV CONC (PAV); REMOV CONC (PAVERS); REMOV CONC (DRIVEWAYS); REMOV CONC (SIDEWALK, RAMP OR SUP); EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C1); RIPRAP (CONC)(5 IN); FULL - WIDTH MOWING; LITTER REMOVAL; TMA (STATIONARY); REMOV CONC (MISC); JCTBOX(COMPL)(PJB)(3FTX3FT); JCTBOX(COMPL)(PJB)(4FTX4FT); INLET (COMPL)(PCO)(3FT)(NONE); INLET (COMPL)(PCO)(3FT)(LEFT); INLET (COMPL)(PCO)(3FT)(RIGHT
22 days left Texas
TxDOT - Dallas District
EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C1); EMBANK (FNL)(DC)(TY C2); FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS); CEM STABIL BKFL; FLOWABLE BACKFILL; CL C CONC (ABUT)(HPC); CL C CONC (CAP)(HPC); CL C CONC (COLUMN)(HPC); CL C CONC (RAIL FOUNDATION)(HPC); APPROACH SLAB (HPC); RIPRAP (CONC)(4 IN); RIPRAP (CONC) (CL B) (4 IN); RIPRAP (CONC)(FLUME); RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE COMMON)(DRY)(12 IN)
21 days left Texas
TxDOT - Dallas District
BLOCK SODDING; VEGETATIVE WATERING; DRILL SHAFT (RDWY ILL POLE) (30 IN); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); BIODEG EROSN CONT LOGS (INSTL) (18"); BIODEG EROSN CONT LOGS (REMOVE); IN RD IL (TY SA) 30T-4 (250W EQ) LED; IN RD IL (TY SA) 30T-4-4 (250W EQ) LED; CONDT (PVC) (SCH 40) (2"); CONDT (PVC) (SCH 40) (2") (BORE); CONDT (PVC)
21 days left Texas
TxDOT - Dallas District
MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); CONDUIT (PREPARE); INSTALL HWY TRF SIG (UPGRADE); VIVDS PROSR SYS; VIVDS CAM ASSY FXD LNS; VIVDS CAM ASSY 360; VIVDS CNTRL SOFTWARE; VIVDS CABLING; GROUND BOX (PREPARE)