28 days left Texas
TxDOT - Fort Worth District
SPOT MOWING; HEADER TYPE EXPANSION JOINT; FULL - DEPTH REPAIR CRCP (6"); FULL - DEPTH REPAIR CRCP (8"); FULL - DEPTH REPAIR CRCP (10"); FULL - DEPTH REPAIR CRCP (12"); FULL - DEPTH REPAIR CRCP (13"); FULL - DEPTH REPAIR CRCP (15"); FULL-DEPTH REP(BR APPR SLAB)(9"-13"); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R; SNOW AND ICE CONSTROL (SHADOW VEHICLE); SNOW AND ICE CONTR
29 days left Texas
TxDOT - Fort Worth District
AGGR (TY-PB GR-4 MOD); BARRICADES, SIGNS AND TRAFFIC HANDLING; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRKR TY II-A-A; RE PM TY II (Y)6"(BRK)(020 MIL); RE PM TY II (Y)6"(SLD)(020 MIL); MOBILIZATION; ASPH (AC-20-5TR)
29 days left Texas
TxDOT - Fort Worth District
AGGR (TY-PB GR-4 MOD); BARRICADES, SIGNS AND TRAFFIC HANDLING; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRKR TY II-A-A; RE PM TY II (Y)6"(SLD)(020 MIL); MOBILIZATION; ASPH (AC-20-5TR)
29 days left Texas
TxDOT - Fort Worth District
EMBANK (FNL)(DC)(TY B); FLOWABLE BACKFILL; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); SET (TY II) (18 IN) (RCP) (6: 1) (P); SET (TY II) (24 IN) (RCP) (6: 1) (P); REMOV STR (SET); IN SM RD SN SUP&AM TY10BWG(1)SA(T); REMOVE SM RD SN SUP&AM; RE PM TY III (W)(ARROW); RE PM TY III (W)(WORD); REFL PAV MRKR TY II-C-C; PAV SURF PREP FOR MRK (ARROW); PAV SURF PREP FOR MRK (WORD); PAV SURF PREP FOR
28 days left Texas
TxDOT - Fort Worth District
EXCAV (ROADWAY); EMBANK (FNL)(OC)(TY B); AGGR (TY-B, GR-4)(SAC-B); TMA (STATIONARY); TMA (MOBILE OPERATION); PORTABLE CHANGEABLE MESSAGE SIGN; IN SM RD SN SUP&AM TY10BWG(1)SA(P); REMOVE SM RD SN SUP&AM; INSTL OM ASSM (OM-2Z)(WFLX)GND(BI); WK ZN PAV MRK NON-REMOV (W)(ARROW); WK ZN PAV MRK NON-REMOV(W)(WORD); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRK TY I (W)