16 days left Texas Changed 10d ago
TxDOT - Houston District
TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); GROUND BOX TY D (162922)W/APRON; TIMBER POLE (CL 2) 35 FT; TIMBER POLE (CL 2) 40 FT; TIMBER POLE (CL 2) 50 FT; REMOVE ELECTRICAL SERVICES; REMOVING TRAFFIC SIGNALS; PED SIG SEC (LED)(COUNTDOWN); PED SIG SEC (HOUSING ONLY); BACK PLATE (12")(1 SEC); VEH SIG SEC (12")(LED)(YEL)(SOLAR); REMOVE RDSD FLASH BEACON ASSEMBLY; INSTL RDSD FL
16 days left Texas Changed 10d ago
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
17 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
17 days left Texas
TxDOT - Houston District
MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); RELOCATE RD IL ASM (CTB MOUNT); IN RD IL (DECORATIVE WAVE SCHEME POLE); CONDT (HDPE) (2"); CONDT (HDPE) (2 1/2"); ELEC CONDR (NO.8) BARE; ELEC CONDR (NO.6) BARE; ELEC CONDR (NO.6) INSULATED; ELEC CONDR (NO.4) BARE; ELEC CONDR (NO.4) INSULATED; ELEC CONDR (NO.2) INSULATED; CONCRETE RAIL REPAIR
16 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); BLOCK SODDING; VEGETATIVE WATERING; IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); MULCH; RIPRAP (CONC)(6 IN); LANDSCAPE ESTABLISH; LANDSCAPE TREAT (TY III); LANDSCAPE TREAT (TY IV); TMA (STATIONARY); TMA (MOBILE OPERATION); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); BIODEG
16 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); BLOCK SODDING; VEGETATIVE WATERING; IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); MULCH; SOIL AMEND (TY I); RIPRAP (CONC)(6 IN); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); PLANT
16 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); BLOCK SODDING; VEGETATIVE WATERING; IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); MULCH; SOIL AMEND (TY I); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); PLANT BED PREP (TY II); SO