20 days left Texas Changed 5d ago
TxDOT - Houston District
REMOV CONC (PAV); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); TMA (STATIONARY); CONC SIDEWALKS (5"); CONDT (PVC) (SCH 40) (2"); CONDT (PVC) (SCH 40) (3"); CONDT (PVC) (SCH 40) (4"); CONDT (PVC) (SCH 80) (2") (BORE); CONDT (RM) (1"); CONDT (RM) (1 1/2"); CONDT (RM) (2"); CONDT (RM) (3"); CONDT (RM) (4"); ELEC CONDR (NO.6) BARE; ELEC CONDR (NO.6) INSULATED; ELEC CONDR (2/0) INSULATED; TRAY CAB
20 days left Texas Changed 5d ago
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
21 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
21 days left Texas
TxDOT - Houston District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); RELOCATE RD IL ASM (CTB MOUNT); IN RD IL (DECORATIVE WAVE SCHEME POLE); CONDT (HDPE) (2"); CONDT (HDPE) (2 1/2"); ELEC CONDR (NO.8) BARE; ELEC CONDR (NO.6) BARE; ELEC CONDR (NO.6) INSULATED; ELEC CONDR (NO.4) BARE; ELEC CONDR (NO.4) INSULATED; ELEC CONDR (NO.2) INSULATED; CONCRETE RAIL REPAIR (IN-KIND); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC
20 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; RIPRAP (CONC)(6 IN); LANDSCAPE ESTABLISH; LANDSCAPE TREAT (TY III); LANDSCAPE TREAT (TY IV); TMA (STATIONARY); TMA (MOBILE OPERATION); IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODE
20 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; RIPRAP (CONC)(6 IN); IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); BLOCK SODDING; SOIL AMEND (TY I); PLANT BED PREP (TY II); SO
20 days left Texas
TxDOT - Houston District
EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); BLOCK SODDING; SOIL AMEND (TY I); PLANT BED PREP (TY II); SOIL AMEND (TY II); VEG