Search open tenders

Advanced Filters 2

Showing 1–14 of 14 open solicitations

30 days left Texas

Routine Maintenance Project - Sealed - US0290 - Harris County

TxDOT - Houston District

PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 6); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 8); LANE CLOSURE(SETUP & REM)(TYP 9); LANE CLOSURE(SETUP & REM)(TYP 10); L

Closes
November 10, 2026
Estimate
$580,828
Added
October 6, 2026
30 days left Texas

Routine Maintenance Project - Sealed - SH0288 - Brazoria County

TxDOT - Houston District

PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); CRASH CUSH ATTEN (INSTL)(L)(N)(TL3); CRASH CUSH ATTEN (INSTL)(L)(W)(TL3); REPLACE (SMTC) NARROW; REPLACE (SMTC) WIDE; REPLACE (REACT)(M); REPAIR ATTENUATOR OBJECT MARKER; PORT CTB (ALIGNING); REPAIR (SMTC) NARROW; REPAIR (SMTC) WIDE; REPAIR (QUAD - ELITE) NARROW; REPAIR (REACT)(M); REPAIR (NARROW

Closes
November 10, 2026
Estimate
$565,057
Added
October 6, 2026
23 days left Texas Changed 3d ago

Routine Maintenance Project - Sealed - IH0610 - Harris County

TxDOT - Houston District

TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); GROUND BOX TY D (162922)W/APRON; TIMBER POLE (CL 2) 35 FT; TIMBER POLE (CL 2) 40 FT; TIMBER POLE (CL 2) 50 FT; REMOVE ELECTRICAL SERVICES; REMOVING TRAFFIC SIGNALS; PED SIG SEC (LED)(COUNTDOWN); PED SIG SEC (HOUSING ONLY); BACK PLATE (12")(1 SEC); VEH SIG SEC (12")(LED)(YEL)(SOLAR); REMOVE RDSD FLASH BEACON ASSEMBLY; INSTL RDSD FL

Closes
November 3, 2026
Estimate
$1,322,895
Added
October 1, 2026
23 days left Texas Changed 3d ago

Routine Maintenance Project - Sealed - IH0069 - Harris County

TxDOT - Houston District

TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)

Closes
November 3, 2026
Estimate
$3,805,043
Added
October 1, 2026
24 days left Texas

Routine Maintenance Project - Sealed - IH0610 - Harris County

TxDOT - Houston District

TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)

Closes
November 4, 2026
Estimate
$3,636,811
Added
October 1, 2026
24 days left Texas

Traffic Control Devices - IH 45 - Galveston County

TxDOT - Houston District

MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); RELOCATE RD IL ASM (CTB MOUNT); IN RD IL (DECORATIVE WAVE SCHEME POLE); CONDT (HDPE) (2"); CONDT (HDPE) (2 1/2"); ELEC CONDR (NO.8) BARE; ELEC CONDR (NO.6) BARE; ELEC CONDR (NO.6) INSULATED; ELEC CONDR (NO.4) BARE; ELEC CONDR (NO.4) INSULATED; ELEC CONDR (NO.2) INSULATED; CONCRETE RAIL REPAIR

Closes
November 4, 2026
Estimate
$510,426
Added
September 26, 2026
23 days left Texas

Landscape & Scenic Enhancement - IH 10 - Harris County

TxDOT - Houston District

EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; RIPRAP (CONC)(6 IN); LANDSCAPE ESTABLISH; LANDSCAPE TREAT (TY III); LANDSCAPE TREAT (TY IV); TMA (STATIONARY); TMA (MOBILE OPERATION); IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODE

Closes
November 3, 2026
Estimate
$1,692,724
Added
September 23, 2026
23 days left Texas

Landscape & Scenic Enhancement - IH 10 - Harris County

TxDOT - Houston District

EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; RIPRAP (CONC)(6 IN); IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); BLOCK SODDING; SOIL AMEND (TY I); PLANT BED PREP (TY II); SO

Closes
November 3, 2026
Estimate
$1,692,724
Added
September 23, 2026
23 days left Texas

Landscape & Scenic Enhancement - SH 6 - Harris County

TxDOT - Houston District

EROSION CONTROL COMPOST (VEH); GENERAL USE COMPOST (VEH); MULCH; IRRIGATION SYSTEM (TY I); IRRIGATION SYSTEM (TY II); PLANT MATERIAL (3 GAL); PLANT MATERIAL (30 GAL) (TREE); LANDSCAPE TREAT (TY I); LANDSCAPE TREAT (TY II); LANDSCAPE TREAT (TY III); BIODEG EROSN CONT LOGS (INSTL) (8"); BIODEG EROSN CONT LOGS (REMOVE); BLOCK SODDING; SOIL AMEND (TY I); PLANT BED PREP (TY II); SOIL AMEND (TY II); VEG

Closes
November 3, 2026
Estimate
$1,692,724
Added
September 23, 2026
2 days left Texas

Material Maintenance Project - Sealed - IH0045 - Montgomery County

TxDOT - Houston District

CAT 4A SOD CHLORIDE (DEL)(SITE 1); CAT 4A SOD CHLORIDE (DEL)(SITE 2); CAT 4A SOD CHLORIDE (DEL)(SITE 3); CAT 4A SOD CHLORIDE (DEL)(SITE 4); CAT 4A SOD CHLORIDE (DEL)(SITE 5); CAT 4A SOD CHLORIDE (DEL)(SITE 6); CAT 4A SOD CHLORIDE (DEL)(SITE 7); CAT 4A SOD CHLORIDE (DEL)(SITE 8); CAT 4A SOD CHLORIDE (DEL)(SITE 9); CAT 8A-B BRINE SALT (DEL)(SITE 1); CAT 8A-B BRINE SALT (DEL)(SITE 2); CAT 8A-B BRINE

Closes
October 13, 2026
Estimate
$354,906
Added
September 14, 2026
2 days left Texas

Routine Maintenance Project - Sealed - SH0249 - Harris County

TxDOT - Houston District

TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); IN SM RD SN SUP&AM TY10BWG(1)SA(P); IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM); IN SM RD SN SUP&AM TY10BWG(1)SA(T); IN SM RD SN SUP&AM TYS80(1)SA(P); IN SM RD SN SUP&AM TYS80(1)SA(P-BM); IN SM RD SN SUP&AM TYS80(2)SA(P); IN BRIDGE MNT CLEARANCE SGN ASSM(TY N); IN BRIDGE MNT CLEARANCE SGN ASSM(TY S); IN SM RD SN SUP&AM (INST SIGN ONLY);

Closes
October 13, 2026
Estimate
$680,457
Added
September 14, 2026
2 days left Texas

Routine Maintenance Project - Sealed - US0290 - Waller County

TxDOT - Houston District

TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); REPLACE DOWNSTREAM ANCHOR TERMINAL; REPLACE GUARDRAIL END TREATMENT SYSTEM; REPLACE GDRL END TREATMENT MRKR; REPLACE LINE OR TERMINAL POST (GIBRAL); CHECK AND RE-TENSION CABLE SYSTEM; SPLICE CABLE; PORT CTB (DES SOURCE)(F-SHAPE)(TY 1); REPLACE W-BEAM RAIL; REPLACE THRIE-BEAM RAIL; REPLACE CURVED RAIL; REPLACE CABLE; CONCRETE RAIL

Closes
October 13, 2026
Estimate
$532,540
Added
September 14, 2026
2 days left Texas

Material Maintenance Project - Sealed - IH0069 - Montgomery County

TxDOT - Houston District

RIPRAP(STONE PROT)(12 IN)(DEL)(ST1); RIPRAP(STONE PROT)(12 IN)(DEL)(ST2); RIPRAP(STONE PROT)(12 IN)(DEL)(ST3); RIPRAP(STONE PROT)(18 IN)(DEL)(ST1); RIPRAP(STONE PROT)(18 IN)(DEL)(ST2); RIPRAP(STONE PROT)(18 IN)(DEL)(ST3); CONCRETE SAND(DELIVERY)(SITE 1); CONCRETE SAND(DELIVERY)(SITE 2); CONCRETE SAND(DELIVERY)(SITE 3)

Closes
October 13, 2026
Estimate
$96,200
Added
September 3, 2026

Get told when something opens

We'll watch Texas · TxDOT - Houston District and email you when a new solicitation matches. Free account.

Watch up to ten notices and keep three saved searches on a weekly digest, plus the whole catalogue signed in — every filter, no result cap, the contracting officer and the attachments on every notice, your size under each code, and reminders before deadlines. Unsubscribe in one click.

Ready when you are

Win more public tenders, with a fraction of the effort.

Upload your first tender and get a review-ready checklist of requirements, gaps and deadlines in minutes.

Free account: search every open tender. Your first bid runs with every Business feature, on us.