28 days left Texas
TxDOT - Childress District
CL C CONC (PILE ENCASEMENT); TMA (STATIONARY); STEEL BRIDGE ZONE PAINTING REF STR #4; STEEL BRIDGE ZONE PAINTING REF STR #11; STEEL BRIDGE ZONE PAINTING REF STR #14; STEEL BRIDGE ZONE PAINTING REF STR #15; STEEL BRIDGE ZONE PAINTING REF STR #21; STEEL BRIDGE ZONE PAINTING REF STR #22; JOINT SEALANT; MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; CONC STR REPAIR (EPOXY MORTAR); CONC STR REPA
28 days left Texas
TxDOT - Childress District
CL C CONC (PILE ENCASEMENT); TMA (STATIONARY); STEEL BRIDGE ZONE PAINTING REF STR #1; STEEL BRIDGE ZONE PAINTING REF STR #17; STEEL BRIDGE ZONE PAINTING REF STR #18; MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; CONC STR REPAIR (EPOXY MORTAR); CONC STR REPAIR(RAPID DECK REP(PRT DPT); CONC STR REPR(RAPID DECK REP(FULL DPT)); CONC STR REPAIR (VERTICAL & OVERHEAD)
28 days left Texas
TxDOT - Fort Worth District
SPOT MOWING; HEADER TYPE EXPANSION JOINT; FULL - DEPTH REPAIR CRCP (6"); FULL - DEPTH REPAIR CRCP (8"); FULL - DEPTH REPAIR CRCP (10"); FULL - DEPTH REPAIR CRCP (12"); FULL - DEPTH REPAIR CRCP (13"); FULL - DEPTH REPAIR CRCP (15"); FULL-DEPTH REP(BR APPR SLAB)(9"-13"); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R; SNOW AND ICE CONSTROL (SHADOW VEHICLE); SNOW AND ICE CONTR
29 days left Texas
TxDOT - Houston District
TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); GROUND BOX TY D (162922)W/APRON; TIMBER POLE (CL 2) 35 FT; TIMBER POLE (CL 2) 40 FT; TIMBER POLE (CL 2) 50 FT; REMOVE ELECTRICAL SERVICES; REMOVING TRAFFIC SIGNALS; PED SIG SEC (LED)(COUNTDOWN); PED SIG SEC (HOUSING ONLY); BACK PLATE (12")(1 SEC); VEH SIG SEC (12")(LED)(YEL)(SOLAR); REMOVE RDSD FLASH BEACON ASSEMBLY; INSTL RDSD FL
29 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
29 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
30 days left Texas
TxDOT - Lubbock District
TMA (STATIONARY); MOBILIZATION (CALLOUT); REPLACE LINE OR TERMINAL POST (VALTIR); REPLACE LINE OR TERMINAL POST (GIBRAL); REPLACE CABLE RELEASE POST; CHECK AND RE-TENSION CABLE SYSTEM; SPLICE CABLE; REPLACE CABLE
30 days left Texas
TxDOT - Lubbock District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 18); MAINTENANCE SPEED LIMIT SIGNING; TMA (MOBILE OPERATION); LANE CLOSURE(MAINTENANCE)(TYP 1); LANE CLOSURE(MAINTENANCE)(TYP 2); LANE CLOSURE(MAINTENANCE)(TYP 5); LANE CLOSURE(MAINTENANCE)(TYP 18); ADDITIONAL LANE C
30 days left Texas
TxDOT - Lubbock District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 11); LANE CLOSURE(SETUP & REM)(TYP 13); LANE CLOSURE(SETUP & REM)(TYP 14); LANE CLOSURE(SETUP & REM)(TYP 18); MAINTENANCE SPEED LIMIT SIGNING; TMA (MOBILE OPERATION); LANE CLOSURE(MA
29 days left Texas
TxDOT - Pharr District
TMA (MOBILE OPERATION); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING (SPOT); CLEANING / SWEEPING (HANDWORK)
28 days left Texas
TxDOT - San Angelo District
TACK COAT; PRIME COAT(MC-30 OR AE-P); SP MIXES SP-C SAC-B PG70-22; PLANE ASPH CONC PAV(2"); PLANE ASPH CONC PAV(4"); FULL - DEPTH REPAIR CRCP (10"); ADJUSTING MANHOLES; MOBILIZATION (CALLOUT); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRK TY I (W)8"(SLD)(100MIL); REFL PAV MRK TY I (W)24
28 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); CRASH CUSH ATTEN (DES SOURCE); CRASH CUSH ATTEN (REMOVE); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 6); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 8); LAN
28 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); CRASH CUSH ATTEN (DES SOURCE); CRASH CUSH ATTEN (REMOVE); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 6); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 8); LAN
28 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; TACK COAT; UNDERSEAL COURSE; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL); TY
28 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R; TACK COAT; UNDERSEAL COURSE; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL);
28 days left Texas
TxDOT - Waco District
D-GR HMA TY-C PG70-22; D-GR HMA TY-D PG70-22; TACK COAT; SP MIXES SP-C PG70-22; FLEXIBLE PAVEMENT STRUCTURE REPAIR(4"); FLEXIBLE PAVEMENT STRUCTURE REPAIR(8"); PLANE ASPH CONC PAV(2"); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRK TY I (
28 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; UNDERSEAL COURSE; TACK COAT; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL); TY
30 days left Texas
TxDOT - Lubbock District
MOBILIZATION (CALLOUT); TMA (STATIONARY); REPLACE DOWNSTREAM ANCHOR TERMINAL; REPLACE W-BEAM RAIL; REPLACE THRIE-BEAM RAIL; REPLACE GUARDRAIL END TREATMENT SYSTEM; REPLACE CURVED RAIL; REPLACE LOW FILL CULVERT RAIL; REMOVE RAIL; REPLACE GDRL END TREATMENT MRKR
30 days left Texas
TxDOT - Lubbock District
FL BS(TY A GR 4)(DEL)(ST1); FL BS(TY A GR 4)(DEL)(ST2); FL BS(TY A GR 4)(DEL)(ST3)
28 days left Texas
TxDOT - Dallas District
TMA (STATIONARY); WK ZN PAV MRK SHT TERM (TAB)TY Y-2; TACK COAT; MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; FLEXIBLE PAV STR REPAIR 12" -TYPICAL A; PLANE & TEXT ASPH CONC PAV(0" TO 4"); SP MIXES SP-C SAC-B PG70-22
23 days left Texas
TxDOT - Abilene District
MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); TMA (STATIONARY); REPLACE LINE OR TERMINAL POST (VALTIR); REPLACE LINE OR TERMINAL POST (GIBRAL); REPLACE CABLE RELEASE POST; REPLACE CABLE; SPLICE CABLE
29 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (PAV); REMOV CONC (RIPRAP); REMOV CONC (DRIVEWAYS); REMOV CONC (CURB); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); VEGETATIVE WATERING; FL BS (CMP IN PLC)(TY A GR 1-2)
29 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); REMOV CONC (DRIVEWAYS); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); VEGETATIVE WATERING; FL BS (CMP IN PLC)(TY A GR 1-2) (9"); CEMENT; CEMENT TRT (SUBGRADE)(
29 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); VEGETATIVE WATERING; FL BS (CMP IN PLC)(TY A GR 1-2) (9"); CEMENT; CEMENT TRT (SUBGRADE)(10"); PRIME COAT(MC-30 O