3 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME SHIPYARDS.DLA MARITIME - PORTSMOUTH
**10/16/26: SPMYM327Q1100 0002 updates the material description for CLIN 0023. Be sure to use this updated document for quoting **10/13/26: SPMYM327Q1100 0001 fixes an error in the description of CLIN 0045. Be sure to use this updated document for quoting,** This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR part 12, as supplemented wit
4 days left California Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
Rental of one (1) Electric 800 CFM Low Pressure Air Compressor (oil free) Naval Base Point Loma, San Diego, CA PLOMA Portsmouth Naval Shipyard (PNSV) is seeking to rent one (1) Electric 800 CFM Low Pressure Air Compressor (oil free). The Statement of Work (SOW) outlines the specifications that meet the essential requirements for the procurement of rental equipment necessary to to establish a tool
1 day left Connecticut
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
Requirement Title: Scrubbers and Burners Pre-Avail Inspection Solicitation Number: N3904027Q3201 Response Deadline: 10/22/2026 @1200 PM EST POC: Gordon Roberts III (gordon.j.roberts1@navy.mil); 207-451-7119 GENERAL INFORMATION: 1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.2, as supplemented with addi
2 days left Maine
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
This Sources Sought announcement is published FOR MARKET RESEARCH PURPOSES ONLY. No solicitation is available. Responses to this notice are NOT offers and CANNOT be accepted by the Government to form a binding contract. The Portsmouth Naval Shipyard is conducting market research to find any potential sources that can provide the rental/lease of Vacuum Recovery Units and associated components in ac
5 days left New Hampshire Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO NH.USPFO NH PROCUREMENT.W7NN USPFO ACTIVITY NH ARNG
*Amendment 1 - 14 October 2026* - This amendment is to adjust the due date from 20 October 2027 to 22 October 2026 caused by a typo. This amendment also includes an adjustment to the language in PWS paragraph 1.4.7.1 and 5.1.5. This amendment also includes the addition of Wage Determinations for all counties within the specified 40 mile radius of Concord NH and the inclusion of all RFIs that have
3 days left New Hampshire
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.ENGINEER RESEARCH AND DEVELOPMENT CENTER.W2R2 COLD RGNS RSCH ENG LAB
The U.S. Army Corps of Engineers (USACE), Engineering Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL), Signature Physics Branch (SPB) intends to award a contract on a sole source basis to Exploration Instruments LLC under the authority provided at RFO 12.102(a). Requirement: The TEM2Go geophysical scanner shall fulfill the following specifications:
2 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME SHIPYARDS.DLA MARITIME - PORTSMOUTH
This notice is a sources sought notice for a requirement for Portsmouth Naval Shipyard. This notice is being issued to determine interested vendors and to help establish an appropriate set aside if applicable. Please note that this is NOT a Request For Quote (RFQ) and submission of your company’s interest may not result in your company being considered for a set-aside or bidders list for the RFQ.
5 days left New Hampshire
City of Lebanon
The project consists of replacing the existing superstructure with 12” deep deck beams of varying lengths. The existing substructure that forms the tunnel is to remain in place. The project also consists of concrete repairs to the substructure and the sidewalk. Roadway approach work will be limited to approximately 50’ on each approach. Additional work will also include the replacement of existing
5 days left New Hampshire Changed 1d ago
City of Lebanon
The project consists fo excavating overburden soil material in the future Phase IIIA area, stockpiling the excavated soil, and constructing a perimeter access road. Work associated with the project includes earthwork, stormwater management, perimeter access road construction and installing and maintaining construction erosion and sedimentation control measures.