7 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME SHIPYARDS.DLA MARITIME - PORTSMOUTH
**10/13/26: SPMYM327Q1100 0001 fixes an error in the description of CLIN 0045. Be sure to use this updated document for quoting,** This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR part 12, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitatio
2 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
***IMPORTANT UPDATE*** The due date for quotes has been extended to from 10/9/2026 to the new date and time of 10/15/2026 @ 12 PM EST. Vendor questions and answers are still being worked for completion and are intended to be completed shortly and posted publicly. A further update will be given at a future date. For questions please reach out to the POCs on listed on this notice. ***IMPORTANT UPDAT
1 day left California Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
Please read the Sources Sought in its entirety. This is a Sources Sought Notice requesting capable vendors to provide a Propane Water Heater capable of output of 600,000 BTU/hr, in accordance with the Statement of Work (SOW). Plasae make sure to respond prior to 10/14/2026 @ 8:00 AM EST. Place of Performance: San Diego, CA. Anticipated Start: March 2027. Expected Duration: 3-5 Months Capable vendo
1 day left Maine No Set aside used
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
Portsmouth Naval Shipyard intends to award a sole source Firm-Fixed Price contract with three (3) option years to VRC Metal Systems LLC (Cage Code 71U36) of Box Elder, South Dakota. Under the authority of USC 2304(c) (1) pursuant to FAR 6.202-1(a) (2), the product or services needed by the agency are available from only one responsible source or only from a limited number of responsible sources an
2 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA SHIPYARD.PORTSMOUTH NAVAL SHIPYARD GF
To procure calibration services from a certified/accredited Commercial Calibration Activity (CCA).This SOW establishes the requirements that all calibrations provided by the CCA must meet to be accepted by Portsmouth Naval Shipyard, in accordance with the requirements set forth by the NAVSEA Metrology and Calibration (METCAL) Technical Warrant Holder (TWH) directives (as directed in NAVSEA Letter
4 days left New Hampshire Small Business Set Aside - Total
DEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO NH.USPFO NH PROCUREMENT.W7NN USPFO ACTIVITY NHANG 157
Amendment 01: Update Period of Performance and Brand Name requirements. No other changes were made: The New Hampshire Air National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the Construction of a Small Arms Range (Project SZCQ1099041) at
6 days left Maine Small Business Set Aside - Total
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME SHIPYARDS.DLA MARITIME - PORTSMOUTH
This notice is a sources sought notice for a requirement for Portsmouth Naval Shipyard. This notice is being issued to determine interested vendors and to help establish an appropriate set aside if applicable. Please note that this is NOT a Request For Quote (RFQ) and submission of your company’s interest may not result in your company being considered for a set-aside or bidders list for the RFQ.
9 days left New Hampshire
City of Lebanon
The project consists of replacing the existing superstructure with 12” deep deck beams of varying lengths. The existing substructure that forms the tunnel is to remain in place. The project also consists of concrete repairs to the substructure and the sidewalk. Roadway approach work will be limited to approximately 50’ on each approach. Additional work will also include the replacement of existing
9 days left New Hampshire Changed 4d ago
City of Lebanon
The project consists fo excavating overburden soil material in the future Phase IIIA area, stockpiling the excavated soil, and constructing a perimeter access road. Work associated with the project includes earthwork, stormwater management, perimeter access road construction and installing and maintaining construction erosion and sedimentation control measures.