27 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
27 days left Texas
TxDOT - Houston District
TMA (STATIONARY); DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES); DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS); DEBRIS REMOVAL (DIRECT CONNECTOR); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (DIRECT CONNECTOR)
28 days left Texas
TxDOT - Lubbock District
MOBILIZATION (CALLOUT); TMA (STATIONARY); REPLACE LINE OR TERMINAL POST (VALTIR); REPLACE LINE OR TERMINAL POST (GIBRAL); REPLACE CABLE RELEASE POST; CHECK AND RE-TENSION CABLE SYSTEM; REPLACE CABLE; SPLICE CABLE
28 days left Texas
TxDOT - Lubbock District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 18); MAINTENANCE SPEED LIMIT SIGNING; TMA (MOBILE OPERATION); LANE CLOSURE(MAINTENANCE)(TYP 1); LANE CLOSURE(MAINTENANCE)(TYP 2); LANE CLOSURE(MAINTENANCE)(TYP 5); LANE CLOSURE(MAINTENANCE)(TYP 18); ADDITIONAL LANE C
28 days left Texas
TxDOT - Lubbock District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 11); LANE CLOSURE(SETUP & REM)(TYP 13); LANE CLOSURE(SETUP & REM)(TYP 14); LANE CLOSURE(SETUP & REM)(TYP 18); LANE CLOSURE(MAINTENANCE)(TYP 1); LANE CLOSURE(M
27 days left Texas
TxDOT - Pharr District
TMA (MOBILE OPERATION); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING (SPOT); CLEANING / SWEEPING (HANDWORK)
33 days left Texas
TxDOT - Tyler District
CSS-1H (PICKUP); CSS-1H (DEL)(SITE 1); CSS-1H (DEL)(SITE 2); CHFRS-2P (PICKUP); CHFRS-2P (DEL)(SITE 1); CHFRS-2P (DEL)(SITE 2); CMS-1P (DEL)(SITE 1); CMS-1P (DEL)(SITE 2); CMS-2P (DEL)(SITE 1); CSS-1H (40%)(PICKUP); CSS-1H (40%)(DEL)(SITE 1); CSS-1H (40%)(DEL)(SITE 2)
33 days left Texas
TxDOT - Tyler District
MS-2 (DEL)(SITE 1); MS-2 (DEL)(SITE 2); CSS-1H (PICKUP); CSS-1H (DEL)(SITE 1); CSS-1H (DEL)(SITE 2); CRS-2P (DEL)(SITE 1); CRS-2P (DEL)(SITE 2); CHFRS-2P (PICKUP); CHFRS-2P (DEL)(SITE 1); CHFRS-2P (DEL)(SITE 2); CMS-2P (DEL)(SITE 1); CMS-2P (DEL)(SITE 2); CSS-1H (40%)(DEL)(SITE 1); CSS-1H (40%)(DEL)(SITE 2)
26 days left Texas
TxDOT - San Angelo District
FULL - DEPTH REPAIR CRCP (10"); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); ADJUSTING MANHOLES; MOBILIZATION (CALLOUT); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRK TY I (W)(ARROW)(100MIL); REFL PAV MRK TY I (W)(WORD)(100MIL); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R; TACK COAT; PRIME COAT(MC-30 OR
26 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); CRASH CUSH ATTEN (DES SOURCE); CRASH CUSH ATTEN (REMOVE); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 6); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 8); LAN
26 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); CRASH CUSH ATTEN (DES SOURCE); CRASH CUSH ATTEN (REMOVE); LANE CLOSURE(SETUP & REM)(TYP 1); LANE CLOSURE(SETUP & REM)(TYP 2); LANE CLOSURE(SETUP & REM)(TYP 5); LANE CLOSURE(SETUP & REM)(TYP 6); LANE CLOSURE(SETUP & REM)(TYP 7); LANE CLOSURE(SETUP & REM)(TYP 8); LAN
26 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; TACK COAT; UNDERSEAL COURSE; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL); TY
26 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY II-A-A; REFL PAV MRKR TY II-C-R; TACK COAT; UNDERSEAL COURSE; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL);
26 days left Texas
TxDOT - Waco District
D-GR HMA TY-C PG70-22; D-GR HMA TY-D PG70-22; TACK COAT; SP MIXES SP-C PG70-22; FLEXIBLE PAVEMENT STRUCTURE REPAIR(4"); FLEXIBLE PAVEMENT STRUCTURE REPAIR(8"); PLANE ASPH CONC PAV(2"); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TMA (MOBILE OPERATION); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; REFL PAV MRK TY I (
26 days left Texas
TxDOT - Waco District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MAINTENANCE SPEED LIMIT SIGNING; MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); WK ZN PAV MRK SHT TERM (TAB)TY W; WK ZN PAV MRK SHT TERM (TAB)TY Y-2; PREFAB PM TY C (W)(ARROW); PREFAB PM TY C (W)(WORD); REFL PAV MRKR TY I-C; REFL PAV MRKR TY II-A-A; TACK COAT; UNDERSEAL COURSE; TMA (MOBILE OPERATION); REFL PAV MRK TY I (W)24"(SLD)(100MIL); TY
28 days left Texas
TxDOT - Lubbock District
TMA (STATIONARY); MOBILIZATION (CALLOUT); REPLACE DOWNSTREAM ANCHOR TERMINAL; REPLACE GUARDRAIL END TREATMENT SYSTEM; REPLACE GDRL END TREATMENT MRKR; REPLACE W-BEAM RAIL; REPLACE THRIE-BEAM RAIL; REPLACE CURVED RAIL; REPLACE LOW FILL CULVERT RAIL; REMOVE RAIL
28 days left Texas
TxDOT - Lubbock District
FL BS(TY A GR 4)(DEL)(ST1); FL BS(TY A GR 4)(DEL)(ST2); FL BS(TY A GR 4)(DEL)(ST3)
26 days left Texas
TxDOT - Dallas District
TMA (STATIONARY); WK ZN PAV MRK SHT TERM (TAB)TY Y-2; TACK COAT; MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; FLEXIBLE PAV STR REPAIR 12" -TYPICAL A; PLANE & TEXT ASPH CONC PAV(0" TO 4"); SP MIXES SP-C SAC-B PG70-22
21 days left Texas
TxDOT - Abilene District
TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); REPLACE LINE OR TERMINAL POST (VALTIR); REPLACE LINE OR TERMINAL POST (GIBRAL); REPLACE CABLE RELEASE POST; SPLICE CABLE; REPLACE CABLE
12 days left Texas
TxDOT - Odessa District
TMA (MOBILE OPERATION); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP); CLEANING / SWEEPING (SPOT); CLEANING / SWEEPING (HANDWORK)
27 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (PAV); REMOV CONC (RIPRAP); REMOV CONC (DRIVEWAYS); REMOV CONC (CURB); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); AGGR (TY-PB, GR-3)(SAC-A); CEM STABIL BKFL; FLOWABLE
27 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); REMOV CONC (DRIVEWAYS); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); AGGR (TY-PB, GR-3)(SAC-A); CEM STABIL BKFL; FLOWABLE BACKFILL; CL C CONC (ABUT); CL C CON
27 days left Texas
TxDOT - Bryan District
PREPARING ROW; REMOV CONC (RIPRAP); RMV (14"-18") TRT/UNTRT BASE & ASPH PAV; RMV (7") TRT/UNTRT BASE & ASPH PAV; EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C); FURN & PLACE TOPSOIL (4"); BOND FBR MTRX SEED (TEMP)(WARM); BOND FBR MTRX SEED (TEMP)(COOL); BOND FBR MTRX SEED (PERM)(RURAL)(CLAY); CEM STABIL BKFL; CL C CONC (ABUT); CL C CONC (CAP); CL C CONC (COLUMN); APPROACH SLAB; RIPRAP (MOW STRIP)(4 IN);
27 days left Texas
TxDOT - Dallas District
EXCAV (ROADWAY); EMBANK (FNL)(DC)(TY C1); RIPRAP (CONC)(5 IN); FULL - WIDTH MOWING; LITTER REMOVAL; TMA (STATIONARY); GATE (REMOVE); MAILBOX INSTALL-M (TWG-POST) TY 1; MAILBOX INSTALL-S (TWG-POST) TY 2; MAILBOX INSTALL-D (TWG-POST) TY 2; GROUND BOX TY A (122311); GROUND BOX TY C (162911); GROUND BOX TY C (162911)W/APRON; REMOVE ELECTRICAL SERVICES; ELC SRV TY D 120/240 060(NS)SS(E)TP(O); ELC SRV T