27 days left Texas
TxDOT - Pharr District
BRINE SOLUTION (DEL)(SITE 1); BRINE SOLUTION (DEL)(SITE 2); BRINE SOLUTION (DEL)(SITE 3); BRINE SOLUTION (DEL)(SITE 4); BRINE SOLUTION (DEL)(SITE 5)
22 days left Texas
TxDOT - Dallas District
PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); MOBILIZATION (CALLOUT); MOBILIZATION (EMERGENCY); PERM CONC TRF BARRIER REPAIR (F SHAPE); PERM CONC TRF BARRIER REPLACE (F SHAPE); PERM CONC TRF BARR REPAIR(SINGLE SLOPE); PERM CONC TRF BARR REPL(SINGLE SLOPE); CONC STR REPAIR (VERTICAL & OVERHEAD)
20 days left Texas
TxDOT - Odessa District
REMOV CONC (CURB & GUTTER); CUT & RESTORE ASPH PAVING; FLOWABLE BACKFILL; RIPRAP (CONC)(4 IN); RC PIPE (CL V)(24 IN); HEADWALL (CH - FW - 0) (DIA= 24 IN); SET (TY II) (24 IN) (RCP) (4: 1) (C); REMOV STR (PIPE); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); CONC CURB & GUTTER (TY II); CONC SIDEWALKS (4"); CONC MEDIAN
27 days left Texas
TxDOT - Beaumont District
TMA (STATIONARY); MOBILIZATION (CALLOUT); TREE REMOVAL (4" - 12" DIA); TREE REMOVAL (12" - 18" DIA); TREE REMOVAL (18" - 24" DIA); TREE REMOVAL (24" - 30" DIA); TREE REMOVAL (30" - 36" DIA); TREE REMOVAL (36" - 42" DIA); TREE REMOVAL (42" - 48" DIA); TREE TRIMMING / BRUSH REMOVAL
27 days left Texas
TxDOT - Beaumont District
TMA (STATIONARY); MOBILIZATION (CALLOUT); TREE REMOVAL (4" - 12" DIA); TREE REMOVAL (12" - 18" DIA); TREE REMOVAL (18" - 24" DIA); TREE REMOVAL (24" - 30" DIA); TREE REMOVAL (30" - 36" DIA); TREE REMOVAL (36" - 42" DIA); TREE REMOVAL (42" - 48" DIA); TREE REMOVAL (48" - 60" DIA); TREE REMOVAL (60" - 72" DIA); TREE TRIMMING / BRUSH REMOVAL
27 days left Texas
TxDOT - Beaumont District
TMA (STATIONARY); MOBILIZATION (CALLOUT); TREE REMOVAL (4" - 12" DIA); TREE REMOVAL (12" - 18" DIA); TREE REMOVAL (18" - 24" DIA); TREE REMOVAL (24" - 30" DIA); TREE REMOVAL (30" - 36" DIA); TREE REMOVAL (36" - 42" DIA); TREE REMOVAL (42" - 48" DIA); TREE TRIMMING / BRUSH REMOVAL
20 days left Texas
TxDOT - Odessa District
TMA (MOBILE OPERATION); CLEANING / SWEEPING (CENTER MEDIAN); CLEANING / SWEEPING (OUTSIDE MAIN LANE); CLEANING / SWEEPING (FRONTAGE ROAD); CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
22 days left Texas
TxDOT - El Paso District
CAT 4A SOD CHLORIDE (DEL)(SITE 1); CAT 4A SOD CHLORIDE (DEL)(SITE 2); CAT 4A SOD CHLORIDE (DEL)(SITE 3); CAT 4A SOD CHLORIDE (DEL)(SITE 4); CAT 4A SOD CHLORIDE (DEL)(SITE 5); CAT 8A-R ROAD SALT (DEL)(SITE 1); CAT 8A-R ROAD SALT (DEL)(SITE 2); CAT 8A-R ROAD SALT (DEL)(SITE 3); CAT 8A-R ROAD SALT (DEL)(SITE 4); CAT 8A-R ROAD SALT (DEL)(SITE 5); CAT 8C-B BRINE SALT (DEL)(SITE 1); CAT 8C-B BRINE SALT
22 days left Texas
TxDOT - Dallas District
FLOWABLE BACKFILL; TMA (STATIONARY); PORTABLE CHANGEABLE MESSAGE SIGN; DRAIN INLET CLEANING; REP STL BRIDGE MBR (WELD REPAIR); CLEANING AND SEALING JOINTS (FOAM); PIPE (PVC) (SCH 40) (6 IN); CNC CRACK REPAIR (DISCRETE)(INJECT); CNC CRACK REPAIR (DISCRETE)(SURF SEAL); BRIDGE JOINT REPLACEMENT (SEJ); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; CONC STR REPAIR(DECK REP(PART DEPTH)); CONC ST
22 days left Texas
TxDOT - Dallas District
D-GR HMA TY D PG 64-22 (PICKUP); D-GR HMA TY C PG 70-22 (PICKUP); SP MIXTURES SP-C PG70-22 (PICKUP); SP MIXTURES SP-D PG64-22 (PICKUP)
29 days left Texas
TxDOT - Laredo District
AGGR (TY PB GR 4) (DEL) (ST1)
29 days left Texas
TxDOT - Laredo District
LRA (TY I GR AA) (DEL) (ST1); LRA (TY II GR CS) (DEL) (ST1)
27 days left Texas
TxDOT - Waco District
SPOT MOWING; FULL - WIDTH MOWING; LITTER REMOVAL; LITTER REMOVAL (SPOT); MOBILIZATION (CALLOUT)
27 days left Texas
TxDOT - Waco District
MOBILIZATION (CALLOUT); SPOT MOWING; FULL - WIDTH MOWING; LITTER REMOVAL; LITTER REMOVAL (SPOT)
27 days left Texas
TxDOT - Waco District
HMCL ACP TYPE B (DEL)(SITE 1); HMCL ACP TYPE B (DEL)(SITE 5); HMCL ACP TYPE B (DEL)(SITE 6); HMCL ACP TYPE D (DEL)(SITE 1); HMCL ACP TYPE D (DEL)(SITE 2); HMCL ACP TYPE D (DEL)(SITE 3); HMCL ACP TYPE D (DEL)(SITE 4); HMCL ACP TYPE D (DEL)(SITE 7); HMCL ACP TYPE D (DEL)(SITE 8)
20 days left Texas
TxDOT - Childress District
CAT 8A-R ROAD SALT (DEL)(SITE 1); CAT 8A-R ROAD SALT (DEL)(SITE 2); CAT 8A-R ROAD SALT (DEL)(SITE 3); CAT 8A-R ROAD SALT (DEL)(SITE 4); CAT 8A-R ROAD SALT (DEL)(SITE 5); CAT 8A-R ROAD SALT (DEL)(SITE 6); CAT 8A-R ROAD SALT (DEL)(SITE 7); CAT 8A-R ROAD SALT (DEL)(SITE 8); CAT 8A-R ROAD SALT (DEL)(SITE 9); CAT 8A-R ROAD SALT (DEL)(SITE 10); CAT 8A-R ROAD SALT (DEL)(SITE 11); CAT 8A-R ROAD SALT (DEL)
20 days left Texas
TxDOT - Childress District
ASPH CONC PAT MAT(ASPPM)(DEL)(ST3); ASPH CONC PAT MAT(ASPPM)(DEL)(ST4); ASPH CONC PAT MAT(ASPPM)(DEL)(ST5)
22 days left Texas
TxDOT - San Antonio District
TREE TRIMMING / BRUSH REMOVAL(CHANNELS); EXCAV (CHANNEL); EMBANK (FNL)(OC)(TY B); RIPRAP (CONC)(5 IN); RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE COMMON)(DRY)(6 IN); RIPRAP (STONE COMMON)(DRY)(12 IN); GABIONS (5'X 3')(GALV); TMA (STATIONARY); MTL BEAM GD FEN TRANS (THRIE-BEAM); MTL BM GD FEN TRANS (ANCHOR PLATE); GUARDRAIL END TREATMENT (INSTALL); GUARDRAIL END TREATMENT (REMOVE); INSTL DEL ASSM (D-S
22 days left Texas
TxDOT - Dallas District
EXCAV (CHANNEL); EMBANK (FNL)(OC)(TY C); CEM STABIL BKFL; FLOWABLE BACKFILL; CL B CONC (FLUME); RIPRAP (CONC)(5 IN); RIPRAP (MOW STRIP)(4 IN); RIPRAP (STONE PROTECTION)(12 IN); RIPRAP (STONE PROTECTION)(24 IN); GABIONS (3' X 3')(GALV); PORTABLE CHANGEABLE MESSAGE SIGN; TMA (STATIONARY); TREE REMOVAL (12" - 18" DIA); REALIGN POSTS; CLEANING AND SEALING EXISTING JOINTS; ROCK FILTER DAMS (INSTALL) (T
22 days left Texas
TxDOT - San Antonio District
REMOV CONC (RIPRAP); COMPOST MANUF TOPSOIL (4"); BROADCAST SEED (PERM_RURAL_CLAY); SOIL RET BLKT(SL_MOD_CLAY_SHORT); CONC STR REPAIR (VERTICAL & OVERHEAD); RIPRAP (STONE COMMON)(DRY)(12 IN); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING; TMA (STATIONARY); CONSTRUCTION EXITS (INSTALL) (TY 1); CONSTRUCTION EXITS (REMOVE); BIODEG EROSN CONT LOGS (INSTL) (12"); BIODEG EROSN CONT LOGS (REMOVE);
22 days left Texas
TxDOT - San Antonio District
EMBANK (FNL)(OC)(TY B); FLOWABLE BACKFILL; RIPRAP (CONC)(5 IN); RIPRAP (MOW STRIP)(5 IN); TMA (STATIONARY); MTL BEAM GD FEN TRANS (THRIE-BEAM); DOWNSTREAM ANCHOR TERMINAL SECTION; MTL BM GD FEN TRANS (NON - SYM); REMOVE TERMINAL ANCHOR SECTION; RM MTL BM GD FENCE TRANS (THRIE-BEAM); GUARDRAIL END TREATMENT (INSTALL); GUARDRAIL END TREATMENT (REMOVE); INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB; INSTL DEL AS
22 days left Texas
TxDOT - San Antonio District
EMBANK (FNL)(OC)(TY B); FLOWABLE BACKFILL; RIPRAP (CONC)(5 IN); RIPRAP (MOW STRIP)(5 IN); RIPRAP (STONE COMMON)(DRY)(6 IN); TMA (STATIONARY); MTL BEAM GD FEN TRANS (THRIE-BEAM); MTL BEAM GD FEN TRANS (T101); RM MTL BM GD FENCE TRANS (THRIE-BEAM); RM MTL BM GD FEN TRANS (T101); GUARDRAIL END TREATMENT (INSTALL); GUARDRAIL END TREATMENT (MOVE & RESET); GUARDRAIL END TREATMENT (REMOVE); CRASH CUSH AT
34 days left Texas Changed today
TxDOT - Laredo District
HFRS-2P (DEL)(SITE 1); HFRS-2P (DEL)(SITE 2)
22 days left Texas Changed 7d ago
TxDOT - Amarillo District
TMA (STATIONARY); PORTABLE CHANGEABLE MESSAGE SIGN; TREE REMOVAL (4" - 12" DIA); TREE REMOVAL (12" - 18" DIA); TREE REMOVAL (18" - 24" DIA); TREE REMOVAL (24" - 30" DIA); TREE REMOVAL (30" - 36" DIA); TREE REMOVAL (36" - 42" DIA); TREE REMOVAL (42" - 48" DIA); TREE REMOVAL (48" - 60" DIA); TREE REMOVAL (60" - 72" DIA); MOBILIZATION; BARRICADES, SIGNS AND TRAFFIC HANDLING